中文版 English
  About us
company profile
Organization
Enterprise culture
Development
Awards honor
360 ° panoramic
Factory
Development
Development process
2011
On January 7, 2011, Jiangsu Jinhai Wind Power Technology Co., Ltd. was incorporated in Funing Economic Development Zone, Yancheng City, Jiangsu Province
On March 4, 2011, the first 3000kW fan reverse balance flange tower was successfully installed in the intertidal zone of Hutou cliff, Laizhou Bay, Shandong Province. Meanwhile, the flange stress and bolt looseness were tracked and measured
2010
On November 8, 2010, the concrete pouring of the first 3000kW wind turbine intertidal prestressed anchor bolt foundation was completed
On May 25, 2010, Jinfeng, Jingneng, Tongji University, Tianyuan and Guoshui Baotou jointly measured the bolt preload and tower vibration characteristics of the counter balanced flange tower in wulanyiligeng wind field of Jingneng
On May 10, 2010, Jinhai reverse balance flange was evaluated as a national key new product by the Ministry of science and technology, Ministry of environmental protection, Ministry of Commerce and General Administration of quality supervision, inspection and quarantine
2009
On October 20, 2009, the supporting flange of 1500kW wind turbine tower was certified as
On August 2, 2009, the first 1500kW fan reverse balance flange tower was successfully installed in the Inner Mongolia Ulan yiligeng wind farm. Meanwhile, the flange stress and bolt locking were tracked and measured
On July 1, 2009, the beam slab prestressed anchor bolt foundation concrete pouring of the first 1500kW fan was completed
2008
On April 21, 2008, "successful exchange meeting of fan tower reverse balance flange test" was successfully held
On April 17, 2008, the reverse balanced flange tower model passed the fatigue loading test in the State Key Laboratory of civil engineering
On March 10, 2008, the reverse balanced flange tower model passed the limit loading test in the State Key Laboratory of civil engineering
At the same time, it was successfully installed on the wind turbine control tower in Liaoning Province
2006
On December 19, 2006, Guoshui Baotou wind power was registered in the wind power industrial park of Baotou rare earth high tech Industrial Development Zone
On September 1, 2006, Professor Ma renle of the high rise Structure Research Office of the school of civil engineering, Tongji University proposed the reverse balance flange

Page 4 of 4 Home Page | Previous page | Last page


Copyright@2012 Jiangsu JinHai New Energy Technology co., LTD All Right Reserved Human resources | Contact information
Address: Funing County Economic Development Zone Xin 36 Avenue